(650) 207-6592 | (650) 566-1569 | P.O. Box 2281, Redwood City, CA 94064 | chaineyhauling@sbcglobal.net

Pricing - Our Hauling Prices Start At $35.00 & Up, No Job To Small.

 

Dump Run Rates for Hauling Debris in San Mateo County to the Landfill Dump:

 

 

 MSW - Mixed Debris Commercial & Residential

First Cubic Yard MSW - Mixed Debris (Commercial & Residential Trash, Junk, Appliances, Green Yard Waste and Rubbish Debris): $60.00, ($30.00 Each Additional Cubic Yard)
 
MSW - Mixed Debris: 400-Pound Maximum Weight Limit per Cubic Yard, and $20.00 per Man-Hour for Labor While Loading the Truck*
 
*Additional Recycling Fee Charged for Tires - *No Hazardous Waste

C & D - 1 Construction and Demolition Debris

First Cubic Yard C & D 1 - Construction and Demolition Debris: $65.00, ($35.00 Each Additional Cubic Yard)
 
C & D 1 - Construction and Demolition Debris: 500-Pound Maximum Weight Limit per Cubic Yard, and $20.00 per Man-Hour for Labor While Loading the Truck*
 
*Additional Charge for Recycling Fees for Tires *No Hazardous Waste

C & D - 2 Construction and Demolition Debris

First Cubic Yard C & D 2 - Construction and Demolition Debris: $70.00, ($40.00 Each Additional Cubic Yard)
 
C & D 2 - Construction and Demolition Debris: 600-Pound Maximum Weight Limit per Cubic Yard, and $20.00 per Man-Hour for Labor While Loading the Truck*
 
*Additional Charge for Recycling Fees for Tires *No Hazardous Waste
 
TruckC & D 3 - Heavy Construction & Demolition Debris (3 Cubic Yards Per Load Max.) 

First Cubic Yard of C & D 3 - Heavy Debris (Dirt, Rock, Sand, Brick, Tile, Tar, Asphalt and Concrete Debris): $140.00, ($80.00 Each Additional Cubic Yard)

C & D 3 - Heavy Debris: $20.00 per Man-Hour for Labor While Loading the Truck*

*Additional Charge for Recycling Fees for Rebar & Tires *No Hazardous Waste
 
 Help SignChainey Hauling Co. Labor Rates with Hauling Dump Service:
 
Residential, Commercial & Job Site Debris Cleanup & Loading: $20.00 per Man-Hour
Deconstruction Demolition Work (Tear-Down Service): $25.00 per Man-Hour
Brick, Asphalt & Concrete Jackhammer Demolition Work: $25.00 per Man-Hour
In-Ground Soil, Sand & Rock Hand Pick & Shovel Excavation: $25.00 per Man-Hour
Pruning, Trimming, Brush & Tree Removal, Chain Saw Work: $25.00 per Man-Hour
Weed Whacking, Lawn Mowing & High-Weed Mower Whacking: $25.00 per Man-Hour

 

Featured on YP.COM
Get local advertising from AT&T Ad Solutions
©   AT&T Intellectual Property. All rights reserved. Licensed content used with permission.
text
Sign In